Recently, the 1450mm hot strip mill production line of Tangshan Donghua Iron and Steel Group Co., Ltd. was successfully thermal load tested and put into operation. This project was EPC contracted by Sinosteel Equipment & Engineering Co., Ltd. and subcontracted by Beijing Bestpower Intercontrol Co., Ltd.