At 10:36 on My 20, 2024, as the first steel slab passed through the roughing mill, intermediate mill, pre-finishing mill, finishing mill, air-cooled roller table and finally arrived at the coil collecting station, marks the wire rod mill project of Sansteel Minguang Co.,Ltd. Fujian, China, EPCM contracted by Beijing Bestpower Intercontrol Co., Ltd.(abbr. BPI), was succeed in hot commissioning.
This project selected equipment such as walking beam furnace, high-pressure descaling, short-stress wire rod mill, twin-module finishing mill, reducing-sizing mill, controlled rolling and cooling system, coil collecting equipment, coil transporters, automatic bundling machine, etc. For better centralized control and unified management,the control center was equiped with intelligent facilities, L2 management system, and integrated operation consoles for heating process, steel rolling process, finishing proccess.
After hot commissioning, BPI’s team will continue to debug and launch the L2 automatic system, remote control crane, intelligent equipment, etc., with exquisite technology, excellent strength and meticulous service to help the owners to create a first-class domestic and international advanced high-speed wire production line.